Hitachi Construction Machinery — Hitachi Wheel Loader Manual (EN)

TRANSPORTING TRANSPORTING BY ROAD When transporting the machine on public roads, be sure to first understand and follow all local regulations. • For transporting using a trailer, check the width, height, length and weight of the trailer when the machine is loaded. • Investigate beforehand the conditions of the route to be traveled, such as dimensional limits, weight limits, and traffic regulations. In some cases, getting approval from the authority concerned, disassembling the machine to bring it within dimensional limits or weight limits of local regulations may become necessary.

TRANSPORTING BY TRAILER Provide an appropriate trailer while referring to the weight and dimensions shown in the specifications. When transporting the machine within the weight and dimensions shown in the specifications by a trailer, it is possible to transport the ma- chine without disassembling. LOADING/UNLOADING ON TRAILER WARNING: Be sure to use a loading dock or a ramp for loading/unloading. Always load and unload the machine on a firm, level surface. Ramp/Loading Dock: 1. Before loading, thoroughly clean the ramps, loading dock and flatbed. Dirty ramps, loading docks, and flatbeds with oil, mud, or ice on them are slippery and dangerous. 1 1 M4GB-06-001 2.

Place blocks (1) against the trailer wheels so that the trail- er does not move while using a ramp or loading dock. 3. Ramps must be sufficient in width, length, and strength. Be sure that the incline of the ramp is less than 15 de- grees. 4. Loading docks must be sufficient in width and strength to support the machine and have an incline of less than 15 degrees. 10 to 15˚ M4GB-06-002 6-1