Doosan P086TI — Doosan P086TI Diesel Engine Operation & Maintenance Manual PDF (EN)

9.3. Reassembly 9.3.1. General precautions @ Clean ail the disassembled parts, particularly oil and water ports, using compressed air, then check that they are free from restrictions. @ Arrange the general and special tools in order for engine assembly operation. @ To wet each sliding part, prepare the clean engine oil. @ Prepare service materials such as sealant, gaskets, etc. @ Discard used gaskets, seal rings, and consumable parts, and replace with new ones. @ Apply only the specified torque for bolts in the specified tightening order and avoid over- tightening. @ Be sure to check that all the engine parts operate smoothly after being reassembled.

@ Check the bolts for looseness after reassembly. @ After completing the engine reassembly operation, check if there is missing parts or shortage of parts. @ Keep your hands clean during the working. 9.3.2. Cylinder block Cover the floor of the workshop with wood plate or thick paper to prevent damage the the cylinder surface facing cylinder block with head the and head place fitting to downward. 9.3.3. Oil spray nozzle (for D1146T/PUO86T/ POS86TI) Tighten and assemble the oil spray nozzle flange with fixing bolts using the spray noz- _t 4 zle jig. Torque 8 kgm . EDM30531 9.3.4.

Tappet and cam shaft je @ Undercool a new bush with dry ice for about 2 hours and press it into position in the cylinder block using a bench press. After the pressing operation, measure the inside diameter of the bush cam to check if it is not deformed. -97-