1.10. CE-conforming equipment Introduction Manufacturer-supplied CE-conforming equipment A1 Distance: bucket pivoting point - front axle, horizontal A2 Distance: bucket pivoting point - front axle, vertical B1 Distance: driver's eye - front axle, horizontal B2 Distance: driver's eye - front axle, vertical D1 Distance front axle- lower edge of headlights, horizontal D2 Distance front axle- lower edge of headlights, vertical G Weight of the equipment and carrying load without additional counterweight H1 Distance: bucket pivoting point - bucket upper edge, vertical (carrying position) H2 Distance:
bucket pivoting point - vision line, vertical (carrying position) J Distance road level - lower edge of bucket in carrying posi- tion (to be considered during driving on public roads) Sh Distance: road level - front axle a Tip-in angle b1 Bucket connection dimension boom width, interior c Bucket connection dimension between d1 and d2, vertical d1 Bucket connection dimension bolts for boom d2 Bucket connection dimension bolt for tip-in rod e Bucket connection dimension d1- d2 horizontally displaced h Distance lower edge of bucket - drill hole of boom bolt 1-28 WA100M-5 – VEAM280201 WA100M-5 ft. in.
mm A1 5’ 8" 1770 A2 3’ 9" 1200 Sh 1’ 8" 545 B1 6’ 4" 1946 B2 6’ 4" 1951 C1 4’ 8" 1456 C2 5’ 2" 1578 D1 1’ 1" 325 D2 3’ 3" 1028 G 8’ 4" 2550 H1 2’ 9" 909 H2 4’ 8" 1465 J 0’ 9" 270 X1 6’ 8" 2085 X2 3’ 1" 935 Y1 7’ 1" 2165 Y2 3’ 4" 1035 a 52° 52° b1 3’ 1" 960 c 1’ 3" 423 d1 0’ 1" 40 d2 0’ 1" 40 e 0’ 3" 98 h 0’ 8" 230 Tyre 455/70 R20 SPT9 Bucket 42W-70-22000 42.38 cu ft (1.2 m3)