4 Bulk head mount Cable nuts C2015 4-13 FOOT PEDALS 4.2 Cable Replacement 1300/135 Cable nut Jam nut C2010 Cotter pins Check cable ends, eyelets or rod ends, and mounting pins for wear before removing the cable. Replace worn parts when replacing new cables. Cable ends should be inspect- ed every 150 hours of operation. 1 Raise the boom arms, engage the boom supports and shut off the engine. WARNING Never work under the boom arms without the boom supports engaged. C2010 2 Remove the seat and hydrostatic shield. 3 Loosen the jam nuts on the cable clevis ends. (fig. C2010, C2015) 4 Loosen the cable nuts. (fig. C2012, C2015) 5 Remove the bolts retaining the bulk head mount to the frame plate.
(fig. C2012) 6 Remove the cotter pins from both ends of the cables and remove the clevis pins. (fig. C2010, C2015) 7 Remove the cable. 8 Remove the clevis and eyelet ends of the cable and reuse them if still serviceable. 9 Install the new cable in the reverse order above. There must be a minimum of 3/8’’ (6mm) of thread engagement into the cable clevis and eyelet ends. Note: After installation of a new cable, the foot pedal angle will need to be verified and adjusted if necessary. Refer to page 4-14 ~ 4-15.