SAFE OPERATION - 4 3. AFTER OPERATION 4. SAFE LOADING AND TRANSPORT OF THE EXCAVATOR Before leaving the machine, A Park the excavator on a firm, flat and level surface. If this is not possible, park across the slope. A Lower the attachments and the dozer blade to the ground. A Stop the engine. A Release pressure in the hydraulic system. A Lock all control levers. A Remove the key. A Lock the cab door (if equipped) 1. Observe all regulations concerning the transport of excavators on public roads. 2. Use adequately long and robust ramps when loading on the machine. (for details see "TRANSPORTING THE EXCAVATOR ON A VEHICLE") 3.
Do not change the running direction and to avoid tipping over, do not try to swing the attachment crosswise to the loading ramps. 4. Lower the attachment on the loading bed and release the pressure from the hydraulic system. After loading the excavator on the truck, block the tracks with blocks and tie down the excavator at the appropriate locations. (1) Chain (2) Block 5. Avoid abrupt braking of the vehicle with the excavator loaded. Sudden braking cause the excavator to move and may cause a serious accident. 6. When towing the excavator or pulling a load, the load must be less than the strength of the towing line attached to excavator.
The towing eye should not be used for tie down or lifting of the machine. (1) Pilot control lock lever (A) "Unlock" (B) "Locked" (1) Tow line