MAINTENANCE. SERVICE PROCEDURE ADJUST BUCKET CLEARANCE It is dangerous if the work equipment moves by mistake when the clearance is being adjusted. Set the work equipment in a stable condition, then stop the engine and lock control lever pad safety lock. 1. Set the work equipment to the position shown in the diagram at right, stop the engine and set the safety lock lever to the lock position. 2. Shift 0-ring (1) of the linkage and measure the amount of play (a). Measurement is easier if you move the bucket to one side or the other so all the play can be measured in one place. (In the diagram this is on the left-hand side) Use a gap (clearance) gauge for easy and accurate measure- ment. 3.
Loosen the four plate fixing bolts of (2) and loosen plate (3). Because it uses split shims, you can carry out the operation without removing the bolts entirely. 4. Remove shim (4) corresponding to the amount of play (a) measured above. [Example] If the play is 3 mm, remove two sets of 1.0 mm shim (4 pieces) and 0.5 mm (2 pieces) and the play will become 0.5 mm. Four sets of 1.0 mm (8 pieces), two sets of 0.5 mm (4 pieces) are installed. Two pieces of shim makes one set. When play (a) is smaller than one shim, do not carry out any maintenance. 5. Tighten the four bolts (2). If the bolts (2) are too stiff to tighten, pull out pin stopper bolt (5) for easier tightening.
CHECK WINDOW WASHER FLUID LEVEL, ADD FLUID If air is ejected with the window washer fluid, check the fluid level in window washer tank (1). If showing under the level, fill with automobile window washer fluid. When adding fluid, be careful not to let dirt or dust get in. 199 WARNING WARNING