ASSEMBLY 2) Set the other side link and press-fit it. 3) Check protrution of pin end from link surface on both side. (L4) 4) Confirm both links are parallel with straight edge. 5) Screw gauge bolts in bolt holes and check shoe bolt pitch with pitch gauge. (L9, L10, L11) Shoe bolt pitch gauge Pitch gauge bolts (x4) - 26 -