ASSEMBLY 5. Master Link connection and shoe installation (in the field) 1) Clean shoe mounting surface and keys before shoe and bolt installation. 2) Apply Anti-seize on neck of master bolts. 3) Screw master bolts in the links by hand up to mating surface to be completely contacted, and tighten temporally with portable impact wrench and tighten with shoe bolt impact wrench as same manner as regular shoe bolts. Then tighten by angle as well. (S2) 6. Pin oil level check (if required) In case oil level filled is not sure, put small plug temporally after filling oil, and take the following actions. 1) Set assembled link ass'y(or track ass'y) on ground and stand it small plug side upward.
And keep it over 30 minutes for oil down. - 29 -