HP — INSTALL INTAKE MANIFOLD

Intake Manifold and Cylinder Heads/Intake Manifold 7. If engine is in machine, connect fuel inlet line (D) and fasten with hose clamp (C). 8. If engine is in machine, connect choke cable (B) to choke linkage. Push choke knob down. Hold choke linkage upward (choke plate open). Tighten screw (A) and clamp. M36921 -UN-25JAN90 A—Screw B—Choke Cable C—Hose Clamp D—Fuel Inlet Line M98,2010K,13 -19-08OCT85 9. Connect throttle rod and fasten with clip (A). 10. For T260 engine, install coil bracket on intake manifold. Install and tighten two cap screws. M36920 -UN-25JAN90 CTM2 (19APR90) 10-6 16, 18, 20 & 24HP Onan Engines M98,2010K,14 -19-30JAN87 AllTractorManuals.com 130495 5.

Install new gaskets on intake ports. 6. Install intake manifold and tighten cap screws to 29 ± 2 N·m (257 ± 18 lb-in.). -UN-25JAN90 M36925 -UN-25JAN90 M36926 T260 engine M98,2010K,12 -19-11NOV85 10 6