Pre-Commissioning QA Inspection EP COMMISSIONING & SUPPORT SERVICES (800) 789-9774 Customer Service (562) 463-7192 Fax Server Date iMACs PROJECT #: Project Name Stock Order ID #: Purchase Order #: 0 Package Serial #: 0 EQUIPMENT TYPE: Generator Genset MFG: 0 Genset Model #: 0 Genset Serial #: 0 Engine MFG: 0 Engine Model #: 0 Engine Serial #: 0 Radiator MFG: 0 Radiator Location: 0 Radiator Group #: 0 Control Panel MFG: 0 Control Panel Model #: 0 Control Panel Serial #: 0 Arrangement #: 0 Service Meter units 0 Fuel Type: 0 Rated Kilowatts: 0 Rated kV Amps: 0 Rated Phase: 0 Emission Tier: 0 Rated Power Factor: 0 Rated Volts AC:
0 Open & Enclosed Generator Sets Applications Requirements-Liquid Cooled Generator Sets 0 0 The installing contractor should complete the installation of the generator, including the following items listed below, prior to the scheduled arrival of our field service technicians at the generator installation site for initial start up & commissioning procedures and any applicable testing required. Please mark any items below that do not apply to a specific installation with “N/A”. Once complete, please fax to 562-463-7192.
All scopes of work below must be completed and documented upon this form, and returned to the fax number above at least 48 hours in advance prior to the scheduling of any commissioning services. This form is required for each individual piece of equipment requiring start up and commissioning services.This checklist should be used to validate the completion of generator set installation prior to the scheduling of pre-commissioning serices. A check-list must be completed for each generator set of a multiple installation. Project Details Company Name:0 Customer (End User):0 Site Adress0 City:0 State: Ca Zip: 0 0 0 0 0 State: Ca Zip: 0 Customer Phone #: - 0 0 0 Office Cellphone Fax Email:
Electrical Contractor Contractor Company: Contractor Name: 0 CA State License: 0 0 Account #: 0 Street: 0 City: 0 State: 0 Zip: 0 Contractor Phone #.: - - - 0 Office Cellphone Fax Email: Check List Completed By: Date: Print Name: Company: Any item(s) listed below deemed incomplete and/or needing attention by the Quinn Power Systems Technician(s) to attain the recommended start-up ready status will delay the completion of your generator start up until these correction(s) have been completed.
If the above scopes of work are incomplete, you may, at your discretion, request the Quinn Power Systems Technician to perform the corrective action(s) required to attain start-up ready status at the current Time and Material rate. However, if you choose not to have the Quinn Power Systems Technician perform the corrective action(s) needed, you will be billed for any labor, travel or mileage incurred for that site visit. It will then be contractor’s responsibility to contact Quinn Power Systems EP Commissioning and Support Services Customer Service to reschedule commissioning services. Equipment Site Location and Services COMPLETED?
Building & Installation work complete Site clean & access clear from obstruction Building services complete & commissioned (lighting, electrical auxiliary supplies, water, etc.) Observations 45