INSTALLING THE IMPLEMENT CONTROL BOX CAB OPERATION 3. Set the blower switch and the temperature control dial to the [4] and max (end of clockwise) positions, respectively. (1) Rubber cap (2) Corner cover (1) Mode switch (2) Temperature control dial (3) Blower switch (4) Recirculation or fresh air se- lection switch with indicator light (A) (B) ELECTRICAL OUTLET The tractor is equipped with electrical outlets which serve the following functions. For use with implement (1) Defroster air outlet (1) Accessory electrical outlet (max 10 A) (2) Accessory electrical outlet (A) Terminal: through the ACC position of the key switch (max 5 A) (B) Terminal:
through the battery direct (max 25 A) (C) Terminal: ground NOTE : If you set the mode switch to position, air will not come out from the dashboard air outlets. BEACON LIGHT The beacon light switch with wire harness for beacon light connection is equipped. Turn on the key switch and press the bottom half of the beacon light switch. Then the beacon light and indicator of switch will be activated. Press the top half of the switch, and turn off the light and the indicator. INSTALLING THE IMPLEMENT CONTROL BOX 1. Make an opening in each rubber cap or corner plug. Introduce the implement control cable and hydraulic hose through these openings into the CAB. M5091,M5111 103