Hitachi Construction Machinery — Removal and Installation of Pilot Pump and Regulator

BODY (UPPERSTRUCTURE) / Pump Device Installation IMPORTANT: Check that five O-rings are attached on the regulator mounting surface. 1. Install regulator (6) to main pump (8) in the following procedures. Adjust the two sleeve positions and align the two grooves in both sleeves on the regulator. Place regulator (6) on main pump (8). Insert the feedback link pins into the two grooves in both sleeves. Move the regulator so that two knock pins extended from main pump (8) can enter regulator (6). Install regulator (6) to main pump (8) with socket bolts (7) (4 used). : 8 mm : 50 N m (5 kgf m, 36 lbf·ft) Feedback Link Pin Knock Pin O-Ring 6 7 8 W4GB-02-04-002 2. Install O-ring (5) to pilot pump (1).

IMPORTANT: Place the pilot pump with the suction port (the larger port diameter) facing upward. 3. Install pilot pump (1) to main pump (8) with socket bolts (2) (2 used), spring washers (3) (2 used) and washers (4) (2 used). : 8 mm (0.31 in) : 50 N m (5 kgf m, 36 lbf·ft) W2-6-11