Hitachi Construction Machinery — Assembly of Main Pump

BODY (UPPERSTRUCTURE) / Pump Device IMPORTANT: Do not damage the oil seal (36) sliding surface of drive shaft (11). 8. There are two ring grooves in drive shaft (11). Install retaining ring (32) to the ring groove closer to the end surface. 9. Check the direction of the inner ring of roller bearing (34). Tap and install roller bearing (34) to drive shaft (11) by using a hammer. 12. Assemble front casing (8) into an assembly by the following procedures. Place front casing (8) with the pump casing (2) side facing downward. Apply grease onto the inner surface of oil seal (36). Evenly tap and install oil seal (36) into front casing (8) by using a special tool and a plastic hammer.

Install retaining ring (37) to front casing (8). Turn over front casing (8) and place onto a wooden block of more than 30 square mm (1.2 square in). Install O-ring (31) to front casing (8). Install drive shaft (11) to front casing (8). At this time, by tapping drive shaft (11) by using a plastic hammer, roller bearing (34) can be inserted easily. Align with pin (35) and install cradle plate (22) to front casing (8). Tighten with socket bolts (10) (4 used). (Inner Ring) 34 11 W4GB-02-04-004 10. Install the roller and outer/inner ring plates of roller bearing (34), to drive shaft (11) with the stamped mark facing out. 11. Install retaining ring (32) to drive shaft (11). : 6 mm :

20 N m (2 kgf m, 14.5 lbf·ft) Install O-ring (30) to front casing (8). Install backup rings (44) (2 used) and O-rings (45) (2 used) to restrictor pin (43) when restrictor pin (43) is removed. Install restrictor pin (43) to front casing (8). At this time, install restrictor pin (43) with the orifice hole side facing inside. 43 44 Cradle Plate Side Front Casing Side W4GB-02-04-005 45 Orifice W2-6-17