Hitachi Construction Machinery — Removal and Installation of Control Valve (ZW250)

BODY (UPPERSTRUCTURE) / Control Valve Installation (ZW250) 5. Connect hose (30) to control valve (21) with split flanges (32) (2 used) and bolts (31) (4 used). CAUTION: Control valve (21) weight: 65 kg (145 lb) 1. Hoist control valve (21). Lower control valve (2) to the mounting position on front frame (45). 2. Check the direction for installation and align the mounting holes. 3. Secure control valve (21) to front frame (45) with socket bolts (41) (3 used) and washers (42) (3 used). : 29.5 N m (3 kgf m, 21.5 lbf ft) 6. Connect hoses (24, 27) to control valve (21). Secure hoses (24, 29) with split flanges (22, 28) (2 used for each) and bolts (23, 27) (4 used for each). : 12 mm : 17 mm :

93 N m (9.5 kgf m, 67 lbf ft) : 22 mm : 10 mm : 146 N m (15 kgf m, 108 lbf ft) 7. Connect hoses (4, 7) to control valve (21). Secure hoses (4, 7) with split flanges (1, 8) (2 used for each) and bolts (2, 5) (4 used for each). : 89 N m (9 kgf m, 65 lbf ft) 41 42 41 : 54 N m (5.5 kgf m, 38 lbf ft) 8. Connect pipes (12, 18) to control valve (21). Secure pipes (12, 18) with split flanges (10, 16) (2 used for each) and bolts (11, 17) (4 used for each). : 14 mm 42 21 : 14 mm : 54 N m (5.5 kgf m, 38 lbf ft) W4GB-02-05-025 4. Connect hoses (34, 35, 36, 37, 38, 39 and 40) to control valve (21) as shown in the identification tag. : 19 mm : 29.5 N m (3 kgf m, 21.5 lbf ft) :

39 N m (4 kgf m, 28.5 lbf ft) : 22 mm W2-7-9