John Deere 3029, 4039, 4045, 6059, 6068 — UPPER TIMING GEAR TRAIN INSTALLATION

Camshaft, Balancer Shafts and Timing Gear Train/Gear Train CTM3274 (01JUL99) 20-28 Saran Liter Engines 060799 PN=151 -UN-16JUN98 -UN-19MAY98 CD30603 CD30604 5. Lubricate shaft and gear bushing with TY6333 7. Install washer, with sharp edge toward timing grease* (A). cover, and bolt (B) then tighten to 110 N·m (80 lb-ft). 6. Install idler gear on shaft without turning camshaft 8. Recheck gear timing to make sure it is correct. gear or injection pump gear. On engine with spur gear, use JDG791A Pilot Tool (C) to guide gear onto shaft. Install upper idler gear with part number visible. *Available as service part. CD,CTM125,123 -19-01DEC97 20 28