TM2361 (24JUN08) 9020-15-7 450DLC Excavator Operation and Tests 062608 PN=635 Diagnostic Information CAUTION: Stay clear of moving parts. Position dial indicator so it can be seen while the operator can see you. NOTE: Two people are needed to take the measurement. One to operate the machine and one to take the readings. 1. Check that swing bearing-to-main frame cap screws are tightened to specification. See Upperstructure Remove and Install. (Group 4350.) 2. Check that swing bearing is lubricated with the specified grease. See Track Adjuster, Working Tool Pivot, Swing Bearing, And Swing Bearing Gear –UN–17MAY01 Grease. (Operator’s Manual.) 3.
Check that bearing rotation is smooth and without noise. T140090 T140090 NOTE: Readings vary depending on the location of dial indicator base with respect to the swing bearing support tower. To obtain an accurate reading, the base for dial indicator must be attached to the support tower or as close to it as possible. 4. Install dial indicator with needle point contacting bottom face of bearing outer race and base attached to the swing bearing support tower or as close to it as possible. 5. Move boom and arm to the position shown with bucket off the ground. Bucket must be empty. 6. Turn dial indicator to zero. 7.
Lower the boom to raise front idlers off the ground approximately 500 mm (20 in.). 8. Record dial indicator reading. Swing Bearing—Specification Swing Bearing—Play.................................................... 0.6—1.85 mm new –UN–23NOV92 0.024—0.073 in. new 3.1—4.35 mm maximum allowable 0.122—0.171 in maximum allowable T7886AJ Continued on next page MR50960,00000FC –19–27APR06–2/3 9020 15 7