TM2361 (24JUN08) 9025-05-57 450DLC Excavator Operation and Tests 062608 PN=695 Theory of Operation –UN–17APR06 TX1006459 Boom, Bucket and Auxiliary Valves Cross Sections 91—Bucket Regenerative 97—Boom Flow Rate Control 103—Boom Reduced Leakage 129—Boom Mode Relief Switch Valve Valve—Switch Valve Valve—Check Valve Control Valve 93—Power Passage Check 98—Boom Flow Rate Control 124—Neutral Passage Check 133—Check Valve (lift check) Valve (bucket lift check) Valve—Poppet Valve Valve (boom 2 lift check) 138—Auxiliary Circuit Relief 95—Bucket Dump Circuit 99—Boom 1 Spool 125—Power Passage Check and Anticavitation Valve Relief and Anticavitation 100—Boom Down Circuit Valve (boom 2 lift check) 139—Auxiliary Circuit Relief Valve Relief and Anticavitation 126—Boom 2 Spool and Anticavitation Valve 96—Bucket Curl Circuit Relief Valve 128—Boom Mode Relief Valve and Anticavitation Valve 102—Boom Reduced Leakage Valve—Switch Valve Continued on next page MM61211,0001522 –19–15MAY08–12/15 9025 05 57