John Deere 450DLC — Boom and Arm Reduced Leakage Valves Operation

TM2361 (24JUN08) 9025-05-85 450DLC Excavator Operation and Tests 062608 PN=723 Theory of Operation 97 98 99 2 168 102 180 182 –UN–01MAR06 103 184 185 TX1004019 TX1004019 Boom Down Schematic 97—Boom Flow Rate Control 99—Boom 1 Spool 103—Boom 1 Reduced 180—Supply Oil Valve—Switch Valve 102—Boom 1 Reduced Leakage Valve—Poppet 182—Pilot Oil 98—Boom Flow Rate Control Leakage Valve—Switch Valve 183—Trapped Oil Valve—Poppet Valve Valve 168—Boom Cylinder (2 used) 184—Return Oil Boom Down Position—When a function is actuated, 1 reduced leakage valve—poppet valve (103) to flow the boom 1 spool (99) allows pilot oil to shift the boom to return oil.

The poppet valve opens allowing oil from 1 reduced leakage valve—switch valve (102). The the boom cylinder head end (401) to flow past the switch valve allows oil on the spring side of the boom boom 1 spool to return oil (184). Continued on next page LD30992,0000262 –19–26APR06–4/5 9025 05 85