Theory of Operation 15—From Pump 1 105—Arm 2 Flow Rate Control 107—To Arm 2 Spool 200—Pump 1 Supply Oil 71—From Arm 2 Flow Rate Valve—Switch Valve 182—Pilot Oil 201—Reduced Flow Pump 1 Pilot Valve (port SK) 106—Arm 2 Flow Rate Control 184—Return Oil Supply Oil 104—Arm 2 Flow Rate Control Valve—Poppet Valve Valve—Check Valve LD30992,0000259 –19–15MAY08–4/4 Boom Mode Circuit Operation Information not available at the time of release. LD30992,0000264 –19–08JUN06–1/1 Counterweight Removal Circuit Operation For information on Counterweight Removal Circuit, see Main Relief and Power Digging Valve Circuit Operation (9025-05).
OUT3035,0000021 –19–26APR06–1/1 9025 05 97 TM2361 (24JUN08) 9025-05-97 450DLC Excavator Operation and Tests 062608 PN=735