John Deere 450DLC — Swing Speed Slow In Both Directions Diagnostic Procedure

Diagnostic Information Swing Speed Slow In Both Directions Diagnostic Procedure –1/1 TM2361 (24JUN08) 9025-15-31 450DLC Excavator Operation and Tests 062608 PN=781 4 Pressure Sensor Check Key on, use monitor service menu to display following pressure sensors. • Pump 1 Delivery Pressure • Pump 2 Delivery Pressure • Boom Up Pilot Pressure • Arm-In Pilot Pressure See Monitor Service Menu Operation. (Group 9015-16.) NOTE: To use gauge to check pressure, See Main Relief and Power Digging Valve Test and Adjustment or see Control Valve Spool Actuating Pilot Pressure Test. (Group 9025-25.) Actuate arm in or boom up function to view reading. Put power mode switch on HP and work mode on digging.

Run engine at fast idle and operate arm-in or boom up functions over relief. Record pressure. Do all pump 1 and 2 delivery pressures go above 30.4 MPa? Is maximum pilot pressure approximately 3.9 MPa? YES: Diagnostic procedure complete. NO: Replace pressure sensors as required. For pump 1 and pump 2 pressure sensor locations, see Pump Harness (W8) Component Location. (Group 9015-10.) For boom up and arm in pressure sensor locations, see Machine Harness (W2) Component Location. (Group 9015-10.) NO: Check wiring harness. For pump 1 and pump 2 pressure sensors, see Pump Harness (W8) Wiring Diagram.

(Group 9015-10.) For boom up and arm in pressure sensors, see Machine Harness (W2) Wiring Diagram. (Group 9015-10.) – – –1/1 9025 15 31 Diagnose Swing Circuit Malfunctions TX19495,0000007 –19–24APR06–1/1