hitachi — REMOVE AND INSTALL PILOT VALVE

UPPERSTRUCTURE / Pilot Valve 6. Install covers (15, 16) to bracket (9) with bolt (14) and screw (17). : 3.3 to 4.2 N m (0.3 to 0.4kgf m, 2.4 to 3.1 lbf ft) 7. Install covers (15, 16) to bracket (9) with screw (13). : 10 mm 15 14 16 17 W1JB-02-07-011 9 9 13 16 W1JB-02-07-014 15 8. Install boot (11) to bracket (9) with screws (12) (4 used). 9. Install lever (5) to bracket (9) with bolts (10) (2 used). 11 9 12 W1JB-02-07-002 5 : 6 mm : 20 N m (2 kgf m, 15 lbf ft) 9 10 W1JB-02-07-012 W2-7-6