hitachi — REMOVE AND INSTALL ENGINE

UPPERSTRUCTURE / Engine 10. Install connectors (25) (5 used). Install plate (23) to main frame (17) with sems bolts (24) (2 used). 24 23 : 50 N m (5 kgf m, 37 lbf ft) 11. Secure the blowby hose to band (22). 12. Secure wire harness (26) to main frame (17) with the clamp (2 places). : 17 mm 26 17 W1V7-02-11-006 25 : 50 N m (5 kgf m, 37 lbf ft) 13. Secure fuel hoses (105) (2 used) to engine (74) with clamps (104) (2 used). : 17 mm W1V7-02-11-005 74 104 : 7 mm W1V7-02-11-015 W2-11-14 22 ブ 1 ブ ローバイホース 7 1 7 105