UNDERCARRIAGE / Travel Device 24. Install spacer (2), first stage planetary gears (24) (3 used), needle bearings (25) (3 used), thrust plates (23) (6 used), pins (22) (3 used) and spring pins (21) (3 used) to first stage carrier (11) in the same procedures as steps 13 to 16. 25. Align the first stage carrier (11) assembly with the spline in second stage sun gear (10). Install the first stage carrier (11) assembly to ring gear (13). 26. Add gear oil 10.2 L (2.7 US gal.) into ring gear (13). 27. Insert propeller shaft (12) into the center of carrier. Mesh the splines of motor (31) and propeller shaft (12) and install. 28. Clean the mounting surface for ring gear (13) and cover (18).
Apply THREEBOND #1215 or LOCTITE #5020 to the ring gear (13) side. Install cover (18) to ring gear (13). Install cover (18) to ring gear (13) with bolts (19) (20 used). : 90 N m (9 kgf m, 66 lbf ft) 29. Wind the seal tape onto plugs (20) (3 used). Install plugs (20) (3 used) to cover (18). : 19 mm : 10 mm : 49 N m (5 kgf m, 36 lbf ft) W3-2-17