16. TROUBLESHOOTING 16.4 USING METHOD FOR LIGHT-WEIGHT TOWING HOOK WARNING The shackle must always be used. Hold the rope level and direct it straight to the track frame Move the machine slowly in the Lo mode. The track frame has been equipped with a hook to pass the shackle for towing light objects. 16.5 PRECAUTIONS ON PARTICULAR JOBSITES 1. When carrying out digging operations in water, if the work equipment mounting pin goes into the water, carry out greasing every time the operation is carried out. 2. For heavy-duty operations and deep digging, carry out greasing of the work equipment mounting pins every time before operation.
After greasing, operate the boom, arm and bucket several times, then grease again. PC130/150LGP-6K ENG 2-98