Operation 3.4 Transportation Unloading 1. Load and unload on firm level ground only. Maintain a safe distance from the edge of a road. 2. Apply the brakes on the trailer securely and insert blocks under the tires to ensure that the trailer does not move. Then fix the ramps in line with the centers of the trailer and the machine. Be sure that the two sides are at the same height as one another. Ramp Block Blocks Make the angle of the ramps a maximum of 15є. Distance between ramps Max. 15° Set the distance between the ramps to match the center of the tires. GK032225 If the ramp sags appreciably, reinforce it with blocks, etc. 3. Remove the chains and wire ropes fastening the machine. 4.
Start the engine. Warm the engine up fully. 5. Check that the work equipment control lever is at the HOLD position, then set the safety lock lever to the FREE position. Free 6. Determine the direction of the ramps, then drive the machine slowly down the ramps to unload the machine. Lock GK032194 WA150-5H – VEAM934100 3-101