Komatsu — Lubricating

4.8 Service procedure Maintenance Every 250 hours service Lubricating NOTE On jobsites where there is a lot of heavy-duty work, or on jobsites where operations are carried out continuously for more than eight hours, reduce the greasing interval and carry out greasing more frequently. 1. Put the work equipment horizontally in contact with the ground, then stop the engine. 2. Using a grease pump, pump in grease through the grease fittings marked by the arrows. 3. After greasing, wipe off any old grease that was pushed out.

GK032064 (1) Dump cylinder pin (2 places) (2) Lift cylinder pin (4 places) 3 (3) Lift arm pivot pin (2 places) 2 (4) Tilt lever pin (1 place) 5 (5) Steering cylinder pin (4 places) 2 5 4 GK015031 1 3 2 1 5 5 2 GK015032 WA150-5H – VEAM934100 4-49