. MAINTENANCE MAINTENANCE PROCEDURE MAINTENANCE MAINTENANCE PROCEDURE 4 - 23 5. Remove the cover under the 6. Set the container under drai catch the coolant mixture. After draining the antifreeze s tighten drain plug (3), then radiator is filled with water, sta olution, close drain valve (2) and fill with clean water. After the rt and run the engine at low idling speed. After the water temp F), run the engine for about 1 8. Stop the engine and open d plug (3) to drain the water. 9. After draining the water, clea For the cleaning method, foll ow the instruction of detergent. 10. Close drain valve (2). Wind s eal tapes onto drain plug (3), then tighten it. Install the cover under the dr 12.
Add coolant mixed with antifr eeze until it overflows from the water filler. Decide the proportions of ant ifreeze and water according to the table for the mixing rate of water and antifreeze. 13. To remove air in the cooling (While doing this, leave the r 14. Drain the coolant from sub- sub-tank, then add water unti l the coolant level is between the FULL and LOW marks. 15. Stop the engine, wait for app until the coolant level is near the cap. Check the coolant le rox. 3 minutes, then add coolant the coolant filler port, and tighten vel and add coolant if necessary.