Komatsu — INITIAL 250 HOURS MAINTENANCE (ONLY AFTER THE FIRST 250 HOURS)

. MAINTENANCE MAINTENANCE PROCEDURE 4 - 50 CHECK BEFORE STARTING For details of the following items, see "Checks Before Starting (PAGE 3-60)" in the OPERATION section. Check coolant level, add coolant Check oil l evel in engine oil pan, add oil Check fuel level, add fue Check oil l evel in hydraulic tank, add oil Check dus t indicator Check wat er separator Check electric wiring Check function of horn