. MAINTENANCE MAINTENANCE PROCEDURE LUBRICATING (3) Blade foot pin (2 places) 4 - 53 EVERY 250 HOURS MAINTENANC Maintenan ce for every 50 hours s ervice should be carrie d ou t at t he s ame NOTICE I f any ab normal noise is generated from a ny g reasing point, c arry out greasing regardless of the g Carry ou t greasing eve ry 10 hours f or the first 50 hours o n a new machine. After the machine was subjected to jobs i n th e water, be sure to g rease the wet Prepare a grease g 1. Set th e machine t diagra the en gine. 2. Using fittings shown by a 3.
After g reasing, wip e off any ol d grease tha t was p ushed shown the the right hen stop (Only machines with b lade specification (1) Blade cylinder foot pin (1 place (2) Blade cylinder rod end pin (1 p lace) (4) Boom f oot pin (2 pl (5) Boom cylinder foot pin (1 place