Komatsu — CSV Export

Payload Meter III - Section 60 08/06 OM6008 Page 60-30 . Maximum - frame torque Time when the maximum - frame torque occurred Maximum sprung weight calculation Time when the maximum sprung weight calculation occurred Left front tire-kilometer-hour Right front tire-kilometer-hour Average rear tire-kilometer-hour Frame serial number Reserved 1-5, 7-10: These values are internal calculations used in the continued development of PLM III and must be ignored. Two sets of data are exported. At the top of the file will be the haul cycle data. The columns, left to right, are: Reserved 6: This value is the payload estimate at the shovel just before the truck begins to move.

Truck number Haul cycle start date Haul cycle start time Payload Swingloads Operator ID Warning flags Carry back Total haul cycle time Empty running time Empty stop time The second series of data below the haul cycle data is the alarms. The alarm columns, left to right, are:

Loading time The alarm type Loaded running time The date the alarm was set Loaded stopped time The time the alarm was set Dumping time Alarm description Loading start time Dumping start time The date the alarm was cleared The time the alarm was cleared Loaded haul distance Empty haul distance Loaded maximum speed Time when loaded maximum speed occurred Empty maximum speed Time when loaded maximum speed occurred Maximum + frame torque Time when the maximum + frame torque occurred