11 34 004 Checking/adjusting valve clearances 13 60 110 Checking freedom of throttle cable, checking for chaffing and kinks, replacing if necessary Checking throttle-cable play Checking and adjusting idle speed and throttle-valve synchronisation (Inspections I, II and III) (Inspections I, II and III) • Test-drive the motorcycle until the engine is warm. • Remove the left side panel. • Remove the flap in the right side panel. Oil temperature: ..................at least 90 ° C (194 ° F) • Check valve clearance with feeler gauge and, if necessary, correct with adjusting screw. Valve clearances with engine cold (max. 35 ° C/95 ° F): Inlet.........................................
0.15 mm (0.0059 in) Exhaust ................................... 0.30 mm (0.0118 in) X Tightening torque: Locknut.......................................................... 8 Nm R22000320 • Recheck valve clearances after adjusting. Feeler gauge must pull through between valve stem and adjusting screw with slight resistance. • Assembly is the reverse of the disassembly procedure. • Push back rubber cap (arrow) on throttle and choke cables. • Use the adjusting screws to adjust play of throttle and choke cables. Play of choke cable: .......approx. 1 mm (0.0393 in) Play of throttle cable: .....approx. 1 mm (0.0393 in) e Attention: Make sure that all seals are correctly seated.
Seals and sealing faces must be free from oil and grease. X Tightening torque: Cylinder head cover ....................................... 8 Nm 00.55 R210003 R210003