BMW — Roadworthiness check

Final inspection with road safety and functional check (Inspections I, II, III and IV) Road safety check • Check wheels and tyres. • Check/correct tyre pressures. • Wait at least 10 minutes after heating the engine to operating temperature in the trial run/road test before checking/correcting engine oil level. Tyre pressures: one-up ............................... front 2.2 bar (31.90 psi) ........................................... rear 2.5 bar (36.26 psi) two-up ............................... front 2.5 bar (36.26 psi) ........................................... rear 2.9 bar (42.06 psi) two-up + luggage............... front 2.5 bar (36.26 psi) ...........................................

rear 2.9 bar (42.06 psi) R22000330 • Use the adjusting screw (arrow) to adjust play of the choke cable to zero. • Push the rubber cap into position over the ad- justing screw. • Move the handlebars all the way from left to right and check the settings. Make sure that engine speed does not vary when the handlebars are moved in this way. • Repeatedly open the throttle gradually and in- crease engine speed from idle to approximately n = 2,500 rpm to check throttle-valve synchroni- sation. (Readings shown by Synchro tester must increase and decrease together). If necessary, correct by turning the adjusting screws of the throttle-valve Bowden cable.

Roadworthiness check • Lights • Telltale/warning lights • Horn • Instruments • Special equipment • Clutch • Gear shift • Steering • Footbrake and handbrake, Integral ABS • If necessary, take the motorcycle for a test ride. L Note: Make sure that when the throttle grip is released both throttle valves return to their fully closed posi- tions. • Tighten the locknuts and recheck carburettor balance. • Seal off the vacuum bores. • Assembly is the reverse of the disassembly procedure. 00.57