13 Remove one grounding screw (callout 10). Hint Twist the cable ties to disengage them, and depress the tabs to disengage the saddle clamps. 14 Remove one cable tie and two saddle clamps (callout 11). 15 Disconnect one connector and unseat one connector (callout 12). 16 Unlace and remove the cables from the cable harness (callout 13). 11 8 13 6 10 5 12 7 Figure 166. Lower registration roller assembly (3 of 10) 17 Remove one screw (callout 14) from the flatbed cable cover. 8 14 Figure 167. Lower registration roller assembly (4 of 10) C8523-90921 Rollers and belts 173