Downloaded from https://www.everyspec.com MIL-STD-3001-2A(AS) e. Built-in-test or self-test procedures bit-st-op >. Procedures for testing the equipment when a built-in-test (BIT) feature or self-test capability is provided. These procedures are normally integrated into the operating procedures, but may be required as part of the pre- operational setup procedures. If this information is contained in another document, reference shall be made to the applicable document. f. Operating procedures (normal sequence of operation) op-proc >. Step-by-step procedures for operation of the equipment in normal sequence of operation.
If this information is contained in a test program instruction or another TM, reference shall be made to the applicable document. g. Emergency operation emerg-proc >. Step-by-step procedures by "functional mode" or "emergency condition," detailing the operating procedures with proper warnings or cautions that can be performed without further damage to the equipment. The procedures shall identify any different indications or observations with appropriate actions to be taken. When the equipment should not be operated with a specific "functional mode(s)" or "emergency condition," this requirement shall be clearly identified with appropriate warning or caution. h.
Emergency shutdown procedures emshut-proc >. Emergency shutdown procedures with cautions to be observed, including warnings as to safety of operations to prevent injury to operating personnel. i. Post-operational shutdown procedures post-op-proc >. Procedures to return the equipment to its normal configuration, prior to pre-operational setup, if required. 5.2.6.2 Software loading work packages softldwp >. WPs shall be developed containing procedures for identifying, loading, initializing, and downloading of applicable operational and diagnostic software (see figure 7 ). Identification of the software shall include the purpose, configuration applicability, and version information.
Procedures that verify that the proper software has been loaded and is operating properly shall also be included. All software loading WPs may have an introduction intro >. 6. NOTES (This section contains information of a general or explanatory nature that may be helpful, but is not mandatory.) The notes in section 6 of MIL-STD-3001-1 apply to this Part. 13