Downloaded from https://www.everyspec.com MIL-HDBK-502: A MIL-HDBK-502: A CQUISITION CQUISITION L OGISTICS OGISTICS options in Section H. (Refer to FAR 52.216 - 20 and FAR 52.216 - 22 for guidance). When the government provides the contractor with government furnished property for executing the contract, this information is included in Section H under the appropriate government property clauses, i.e., FAR 52.245-2 for fixed-price contracts and FAR 52.245-5 for Government Property (Cost-Reimbursement, Time-and-Material, Or Labor-Hour Contracts). These clauses set forth the specifics of the relationship between the government and contractor.

Warranty Clauses Since January 1985, DoD has been required to use certain express warranties in each contract for the production of a weapon system with a unit cost exceeding $100,000 or a total cost exceeding $10 million. U.S.C. §2403 describes the codification of weapon system warranty requirements. The express warranties specify that the weapon system will:

(a) conform to the design and manufacturing requirements in the contract; (b) be free from all defects in materials and workmanship at the time of acceptance or delivery as specified in the contract; and (c) conform to the "essential performance requirements" (operating capabilities needed for the system to function properly), as specifically set forth in the production contract. The latter is essentially a warranty that the system will work. It is required only for a weapon system in "mature, full-scale production." This statute makes three specific remedies available to the government in the event that one of the conditions of these warranties is breached.

The government may require the contractor to correct the defect at no cost to the government; the government may correct the defect and charge the cost to the contractor; or the government may correct the defect and reduce the price to deduct the cost of repairs. The statute does not allow the alternative of reducing the price and not correcting the defect. The contracting officer may not waive the required warranties, but may require that they provide more coverage or greater remedies than stated in the statute. If a warranty would not be cost-effective or would not be in the best interest of national defense, a waiver may be granted by the Secretary of Defense.

This authority may be delegated to the Assistant Secretary level of the Department of Defense or of each military department. The policy and procedure concerning waivers is set forth in DFARS 46.770-9. If the weapon system involved is a "major defense acquisition program," prior notice of such a waiver and an explanation must be given to the Congressional committees on Armed Services and Appropriations; for other such waivers, the notice and explanation are to be included in an annual report to these committees (10 U.S.C. §2403(e)). With reference to FAR 46.7 and DFARS 246.7, warranty provisions must be imposed on most new material systems to ensure that the deliverables: (a) 8-14