Downloaded from https://www.everyspec.com MIL-HDBK-502: A MIL-HDBK-502: A CQUISITION CQUISITION L OGISTICS OGISTICS 6.4.2 Supportability Design Factors The following figures (6-5 and 6-6) provide good examples of expressing supportability requirements in measurable terms and building supportability requirements into the design. F-18 MAINTENANCE REQUIREMENTS Direct maintenance : Man-hours/flight hour 11.02 Operational availability 80% Turn around time (max. 3 men) 15 min. Mean time to repair 1 hr. 46 min. Fault isolate time 90% in 5 min. Fault isolate time 100% in 10 min. Engine change 21 min. (4 men) Radar remove and replace 21 min. (2 men) Figure 6-5.

Maintenance Requirements What happens when the logistician isn’t involved in the design process? Logistic problems get built into the design. For example, when the F-4 was designed, the radio was placed to the left of the rear seat bucket under the air data computer. This placement made good sense from the design point of view because it kept a heavy object forward. The radio was relatively reliable, and routine maintenance could be performed in ten minutes or so. The problem was that in order to get to the radio the ejection seat had to be dearmed and the seat bucket and computer removed—and then the process had to be completed in reverse after the radio maintenance had been completed.

The ten minute job had become a four or five hour job. Even worse was the possibility of maintenance-induced failure of the computer when it was reinstalled, which would render the aircraft non- flyable. 6-19