Downloaded from https://www.everyspec.com MIL-HDBK-502: A MIL-HDBK-502: A CQUISITION CQUISITION L OGISTICS OGISTICS program functional elements (e.g., RAM, TMs/TOs, etc.) to minimize redundancies and inconsistencies. There is one hollow data item description (DID), DI-ALSS-81530, which can be used to contract for one or more summaries. If multiple summaries are required at different times, this DID can be called out multiple times, and for each separate contract line item the specific summary and delivery date(s) can be identified.
7.3.1 Life Cycle Application Most of the LMI summaries are applicable in some way during all phases of a system’s life cycle, with the exception of the Post Production Support Summary. Tailoring should be conducted in a given phase to correspond to the level of information available regarding the design level and resource requirements. Phase 0 and Phase I Life Cycle Applications During these early phases (Concept Exploration, and Program Definition and Risk Reduction) the design of a system is usually very flexible and opportunities for conducting tradeoffs and analyses, identifying alternatives, and affecting design from a supportability standpoint exist.
For example, these opportunities include determining early support equipment requirements (built-in test vs. automatic test equipment) and analyzing organic support versus contractor support or extended warranties. Also, Repair Analysis summaries may identify items or parts that should be designed for discard instead of repair. It is also possible at this point to identify high level maintenance and provisioning requirements for tools and test equipment, which can assist in the development of budgets and funding levels for later phases. Programs that make commercial or nondevelopmental item buys should already have information regarding necessary maintenance actions.
From this information, good manpower, skill level, and training projections can be made. In modification programs, high level source maintenance and recoverability (SMR) coding may occur. Consequently a Maintenance Planning or Supply Support type summary, which provides an early view of the contractor’s coding practices, may enable the government to determine whether or not these practices are correct and correspond with the intended maintenance concept. Facilities summaries are especially relevant during Phase I because of the long lead-time normally required for establishing or modifying facilities.
These summaries can be used to identify necessary facility requirements such as test equipment, training aids, building size, and any other special considerations. 7-5