Downloaded from https://www.everyspec.com MIL-HDBK-502: A MIL-HDBK-502: A CQUISITION CQUISITION L OGISTICS OGISTICS requirements when hardware or manpower analysis and training requirements analysis are performed. Special PHS&T instructions should be detailed in PHS&T type summaries during Phase II and identify critical requirements prior to initial provisioning and fielding, especially the handling of hazardous materials. Post Production Support reports are initiated in Phase II and continue in Phase III. This summary should focus on items which may cause support difficulties over the remaining life of the system.
These difficulties may be due to inadequate sources of supply after production lines are shut down or vendors go out of business. The following paragraphs describe general content and life cycle application for each summary. Contractor format is acceptable and encouraged. Note: The following samples are general in nature and do not provide specific guidance . 7.3.2 Maintenance Planning Purpose and Content These summaries provide maintenance planning information that may be used to develop initial fielding plans for the end item’s support structure.
These summaries may also be used to verify that the maintenance actions and support structure are aligned with the government’s requirements and maintenance concept. The information contained within these summaries is associated against system components to the level of detail specified on contract. The repairable items should be identified within the hierarchy of the end item, broken down by an agreed upon configuration control method. The summaries may identify preventive and corrective maintenance actions and the required spares and support equipment.
These summaries may also be used to provide supporting information that justifies the need for each maintenance action, for example, elapsed time of maintenance actions, task frequency, failure rate of an item, and mean time to repair an item. Figure 7-2 presents a sample summary layout. 7-7