Everyspec (implied, based on the URL) AMC PAMPHLET 31a, AMCP 706.198 — Everyspec AMC PAMPHLET 31a: US Army Reliability Development Guide for Military Equipment (PDF)

Downloaded from https://www.everyspec.com AMCP 70-196 A reliability teat planning committee, revised frequently as the program proceeds. chaired by a member of' the reliability group, should be organized and begin to function at Reliability-schedule changes can result the start of the project. This committee from many factors, including design changes, should meet on a regular basis to update the changes in production techniques or location, overall test-program plan as changes occur on and changes resulting from information de- thv project. This committee should include rived from design reviews and preliminary members of reliability, quality assurance, testing.

Reliability schedules developed early product design, test equipment design, pro- enough in the program will be flexible enough duction planning, and test laboratories, to incorporate needed chatrges as the pro- gram progresses, The repreosntativcs of each technical speciality make contributions to the test 4-2.3 DOCUMENTATION planning group, The design engineer specifies the items and attributes to be tested and in- Much documentation is required to plan spected to ensure proper operation of the a full reliability-test program.

The reliability- system; the quality assurance representative test plans should be submitted by contractors specifies the attributes to b, tested for as part of thelt proposals to the Army and, process and quality control; the reliability upon approval, be inlutded in the contract or engineer defines the reliability verification detailed equipment specification. As devel- requirements; test equipment personnel con- opment progresses, the plan is updated as tribute heavily to the test program planning. required, The committee estimates costs and assesses the overall balance between risk and cost, Table 4-6 lists the general information categories of a test plan.

Further details of The basic characteristics of development a reliability-test plan are: tests, qualification tests, demonstration tests, and quality-assurance tests which must be 1. Descriptiom of Demonstration Condi- considered by test management are listed In tions. Tables 4-1 through 4-4 (Ref. 4). Typical steps which must be followed when planning a. Roliability requirements. The values a reliability test are summarized in Table 4-5 of specified MTBF and minimum acceptable and information categories that should he MTBF,'or other measures of reliability, Seo included in a test plan are described in latest, version of Ref. 7. Table 4-6. b. Test purpose.

(1) qualification of 4-2.2 SCHEULES new or redesigned equipment; (2) sampling of production equipment; and (3) longevity Reliability test planning for ail tosts should test begin at the very start of a project (Ref. 2). An error that should be avoided is to post- c. Equipment ideitification. A detailed pone planning for system demonstration description of the equipment under test with tests to a point later in the project. All test notes about necessary auxiliary equipment, planning and scheduling should begin im- failure f which will not be charged to the mcdiately. A preliminary classification equipment under test should be made for all proposed tests.

Test plans should be re,'orded in spread-sheet d. Demonstration sites and facility re- format. These preliminary plans must be quireinonts ' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ A •':;•"[ :+i'P -?II 1+++