Everyspec (implied, based on the URL) AMC PAMPHLET 31a, AMCP 706.198 — Everyspec AMC PAMPHLET 31a: US Army Reliability Development Guide for Military Equipment (PDF)

Downloaded from https://www.everyspec.com 'I AMP 7019 TABLE 6-4 MANAGEMENT AVPCTS OF OUALIPiCATION TEBT• 4 1, Purpoe of Teom To demonevte $Itt the equipment or spse*fIe componets, estmbles, and packages meet specified parlor. manto requirements under stated environmental conditions, 2. Geoerml Deesiptlon Qaellfltioeton trats are formal tests oordut according to procedures specified In the development contract. Sample sie Is small, and thus Inforenti• 1niiysis is limited, 3. Examples of Specific Type of Tests b. Envilronmentai Taeu c, Funotional Testt d. Campetibiliity Tests a. Sefety.margin Tests "f.

Continuity Tests .g Quality Tests 4, Test khohduling Normally contrat specified be performed hefore production release, 5, T at Items PHot-IIn4 Items produced, to the extent possible, under normal production methods. 6. Test .occumntatlon Detailed test requiremmntr and procedures, Test results fully documented, Including analyses end conclusions concerning design quallficetion. 7.

Test Follow-Up Action Approvail of design or Implementation of reo•imended changes to correct deflolencles, Design approval permilt production release, 8, Rellabillty/Meintainability Provisions Limited reliability and maintainability assessments may be specified during dosign qualification tests, suc as a thort continuous.opretion test or tsts of failure dhlgnosic routines. Prlmary applications are limited, however, to quality testing of ports and processes. c, Technical publications 4, Predemonstration-PMgao Schedule: d. Sparc% and consumables a. Ansemhly of test team ., Safety equipment b. Training z. Preparation facilities and support f. Calibration support requirements material A A