Downloaded from https://www.everyspec.com FM 34-54 The exploitation, with finished report, is accomplished within 48 hours. The JCMEC normally is the primary center for all detailed exploitations in theater. Once the general exploitation is accomplished, a more detailed exploitation begins. This is in coordination with the national S&TI SME at the JCMEC. The plan is provided by the national S&TI community. The JCMEC maintains in the Exploitation Company detailed exploitation plans for collection priority equipment. These plans are part of the contingency database for the threat equipment.
The time limit for a detailed exploitation is determined by the tactical needs of the theater and national requirements. F-3