Downloaded from https://www.everyspec.com Contents (Listed by paragraph and page number) Chapter 1 Introduction, page 1 Purpose • 1–1, page 1 References • 1–2, page 1 Explanation of abbreviations and terms • 1–3, page 1 Responsibilities (Army, Air Force, Navy, Marine Corps, Standardization) • 1–4, page 1 Chapter 2 Contracts and Production, page 3 Section I Contracting, page 3 General • 2–1, page 3 Development of contract requirements • 2–2, page 3 Establishment of acquisition milestones • 2–3, page 3 Contract design • 2–4, page 3 Solicitations • 2–5, page 3 Acquisition management data • 2–6, page 3 Section II Production, page 4 General • 2–7, page 4 Production Management • 2–8, page 4 Chapter 3 Program Management, page 4 Section I Major Item Programming System, page 4 Program planning • 3–1, page 4 Acquisition Responsibility • 3–2, page 4 Section II Research and Development Programming System, page 4 Objectives • 3–3, page 4 Information requirements • 3–4, page 5 Section III Development and Product Improvement Planning, page 5 General • 3–5, page 5 MEPGS Master Plan guidelines • 3–6, page 5 PM-MEP responsibilities • 3–7, page 5 Military Service responsibilities • 3–8, page 5 POC responsibilities • 3–9, page 5 Section IV Preparation of Military Interdepartmental Purchase Requests (MIPRs), page 5 General • 3–10, page 5 Acquisition direction • 3–11, page 5 Section V Funding for Engineering Change Proposals (ECPs), page 6 General • 3–12, page 6 ii AR 700–101/AFI 63–110(I)/NAVFACINST 4120.12/MCO 11310.8C/DLAI 4120.16 • 2 September 2003