Department of Defense MIL-STD-31000A — MIL-STD-31000A Technical Data Packages Standard — DoD Manual PDF (EN)

Downloaded from https://www.everyspec.com MIL-STD-31000A APPENDIX A format specifications. Other format details should be provided as required in A.3.2.8 Block 8. Applicability of Standards—for example, specifying ASME Y14.5 and ASME Y14.41 for fully annotated 3D models. A.3.2.2.1 2D Drawings. This option determines if 2D drawings are required for delivery. Specify what format is required for the delivery of the drawings. A.3.2.2.2 3D digital models. This option determines if 3D digital models are required for delivery. Specify if only 3D digital models or 3D digital models with associated 2D drawings are required. Specify what format is required for the delivery of the models.

A.3.2.2.3 Metadata. This option determines if metadata required for delivery. Specify what format is required for the delivery of the metadata. A.3.2.2.4 Associated lists. This option determines if associated lists are required for delivery. Specify what format is required for the delivery of the associated lists. Use in coordination with Block 7 of the Option Selection Worksheet. A.3.2.2.5 Supplementary technical data. This option determines if supplementary technical data products are required for delivery. Specify what format is required for the delivery of the supplementary technical data products. Specify the type of supplementary technical data in Block 8 (Other Tailoring).

Types of supplementary data could include, but is not limited to, manufacturing instructions, simulations, work flow data, inspection equipment or procedures (which are not required as an inherent part of the TDP or TDP element), manufacturing machine code, design studies, analysis studies, test results, and safety data sheets. A.3.2.3 Block 3. CAGE code and document numbers. When contractor CAGE Code and document numbers are specified, the documents will be identified with the CAGE Code and document numbers of the contractor or subcontractor having design activity responsibility.

Usually the Government will not be able to assume control of the drawing originals (masters), except through a subsequent data acquisition action. If the Government intends to take delivery of the drawing originals and to assume design activity responsibility at some time in the future, then the documents should be identified with a Government CAGE Code and Government document numbers. If the Procuring Activity has already determined the CAGE Code and Government document numbers to be used, the CAGE Code should be entered in the “USE CAGE CODE” block and the range of document numbers entered in the “USE DOCUMENT NUMBERS” block.

If the Procuring Activity has not determined the Government CAGE Code and Government document numbers which are to be used, then the Government activity that will specify this information should be identified in the “TO BE ASSIGNED BY:” block. A.3.2.4 Block 4. Drawing formats and drawing forms. These options specify the drawing format to be used and assign responsibilities for providing the drafting material or media (drawing forms) on which the documents are to be generated. A.3.2.5 Block 5. TDP elements required. This option determines the elements of the TDP used to fulfill the design disclosure requirements of the TDP element to be delivered. A.3.2.5.1 Each element selected.

This option gives the Procuring Activity the authority to direct the contractor as to which types of element(s) to use by the individual selection of each element. This may be further tailored for each component, subassembly or part. A.3.2.6 Block 6. TDP data management products. This option determines the management products of the TDP used to fulfill the design disclosure requirements to be delivered. 32