Downloaded from https://www.everyspec.com MIL-STD-81OC Step S - If specified in the equipment specification,execute performance checks on the test item during exposure to the rain as prescribed in General Requirements, 3.2.3. Step 6 - At the conclusion of the rain exposure, remove the test item from the chamber, sponge or lightly wipe accumulatedmoisture from its exterior surfaces, open its case or protective covers, if possible, and visualIy inspect the test item for compliance with General Requirements.,3.2.6. Step 7 - Upon completion of the step 6 visual inspection,perform operational checks on the test item and obtain results in accordance with General Requirements, 3.2. 4. :U*RY .
The following details shal1 be as specified in the equipment speclfIcatlon: a. Procedure number b. Pretest data required c. Failure criteria d. Whether equipment is to operate during rain and length of time required for operation and measurements. 506.1-3 METHOD 506.1