Downloaded from https://www.everyspec.com MIL-STD-81OD 19 July’”1983“ Step 2. Maintain these conditions for 20 hours.1/ step 3. Measure and record the test item temperatures. Step 4. Turn off the solar radiation source for 4 houre. Step ,5. Repeat steps 1 thru ,4 for the number of cycles specified in the test plan. Step 6. Conduct a performance check and visual examination as in II-2.2, steps 2 and 5 and document the ..results. 11-4 ~ a. Previous test methods to which the test item has been subjected. b. Test procedure. c. Results of each performance check. d. Results of each visual examination (and photographs, if applicable). e. Location of temperature sensors on the test item. f.
Test item temperatures and expoetireperiods. s. Solar’lamp bank identification. h. Additional data as required. j.1 If required, operational checks should be conducted during the last 4 hours of each 20-hour exposure when test temperatures are maximized, METHOD 505.2 505.2-17 19 July 1983