U.S. Department of Defense MIL-STD-810D — vdj6225.tmp (EN)

Downloaded from https://www.everyspec.com MIL-STD-810D 19 JuIY 1983 Step 5. Prepare the test item in accordance with General Requirements, paragraph U and as specified for the test category. Examine the test item for physical defects, etc, and document the results. I Step 6 . Step 7 . Ccnduct an operational check and document the results. 1 Step 8 . Prooeed to the required test’’procedureif no problems are found; 6 above. ctherwise, correct the problems and restart with step II-3. PROCEDURES. .= 11-3.1 ~ Step 1. Complete step 1 through 8, paragraph II-2.1. -.. Step 2. Inspect test item to establiah pre-test Criteria and physical condition. Step 3. Verify the test items’ functionality.

Step 4. Mount the test item on the vibration equipment in accordance with the provisions stated m the appropriate category from ,, section I-3.2. . Step 5. Expose the test item t.othe tf?stlevel and duration as determined from section I-3.2. Step 6. During step 5 the test item shall be operated ss,if it were in operational usage. This step”only applies ‘forcategories and equipment for which operaticne during exposure to vibration are appropriate. Step 7. Inspect the test item and compare it to pre-test data and physical condition. If applicable, verify the test item functionality and record the results. Step 8. Repeat steps 2 through ‘Ifor each axis (see paragraph I-4.2:5). Step 9.

Document the test results in accordance with paragraph II-4. II-3.2 &xeQrLU: . Step 1. Complete steps 1 through 5, paragraph,II-2.1. Step 2. Inspect test item to establish pre-test criteria and physical condition. .. Step, 3 . Verify the test items’ functionality. SteQ, 4. Prepare the package tester/test equipment in accordance with I ,,.., : , provisiona of parsgraph II-2.1. ,! 0 METHOD 514.3 19 July 1983 514 . 3 - 72