U.S. Department of Defense MIL-STD-810D — vdj6225.tmp (EN)

Downloaded from https://www.everyspec.com MIL-STD-810D 19 July 1983 II-3.1 FYooedure I - Storaae Step 1. Adjust in the test ohamber. the test item to its storage Configuration, and inetall it Step 2. Adjust plan for storage. the chamber ‘airtemperature tiothat specified in the test Step 3. Following temperature stabilization of the test item (General Requirements, 4.4.3), maintain the storage temperature for a period as speoified in the test plan. Step 4. Conduot a visual examination of the test item and compare,the results with the pretest’data. Record any pertinent physical changes or the fact that there were no obvious changes. Step 5.

If low-temperature operation is required, proceed to II-3.2; otherwiee, proceed to step 6 below. ,, . Step 6. Adjust the chamber air temperature”” to’standard ambient and maintain until temperature.stabilization of the test item has been achie~ed. Step 7. Conduct a complete visual examination of the test item, an! document the results. . Step 8. Conduct an operational checkout of the test.item, and document the results. Step 9. Compare these;data with.the pretest data. II-3.2 Ercxedure II - 0Der@42D ‘Step1. With the test~item ‘temperatureto the low operating in the test chamber, adjuet the chamber air temperature of the test item as.specified in the-test,plan:

Maintain-until temperature stabilization.of ,theteet item has been achieved.. ,, Step 2. Conduct as complete a visual,examination of the test item as chamber access limitations will.allow. ,, Step 3. Document the results. ,, step u. ;Conductan op+ati’onal checkout of the test item as in II-2.2, step 6. Step 5. Document the results. . Step 6. If manipulation of the test item is required at low temperature, proceed to’step 4 of 11-3.3. If not, proceed to step 7 of this procedure. Step’7. Adjust the chamber air temperature to standard ambient-and maintain until temperature stabilization of the test item has been achieved, 19 July 1983 502.2-11 -. METHOD 502”.2