CHAPTER 2 CHAPTER 2 INSTALLATION AND WIRING 4 5 2.1 Peripheral devices ..................................................................................................................................................27 6 2.2 Removal and reinstallation of the operation panel or the front covers....................................................................34 2.3 Installation of the inverter and enclosure design ....................................................................................................38 2.4 Terminal connection diagrams................................................................................................................................47 7 2.5 Main circuit terminals..............................................................................................................................................55 2.6 Control circuit..........................................................................................................................................................69 2.7 Communication connectors and terminals..............................................................................................................85 8 2.8 Connection to a motor with encoder (Vector control) .............................................................................................88 2.10 Connection of stand-alone option units ..................................................................................................................98 2.9 Parameter settings for a motor with encoder..........................................................................................................95 2.11 Wiring for use of the CC-Link IE Field Network (FR-A800-GF) ............................................................................111 9 10 25