7.4.3. Confirm Trace Data Confirm that the correct data is transmitted and received with the Trace Data of CX-Protocol. 44 1 From the CX-Protocol menu bar, select [PLC] - [Upload Trace]. 2 The dialog shown on the right will be displayed. Click [Yes]. 3 Check the Sent and Received messages in the trace data file as shown on the right. * In the example on the right, you can see that the controller has sent the “Serial Trigger” command and received the measurement result contents ■ Send Data of Step 4 in section 7.4.2. Hexidecimal: 54 52 49 47 47 45 52 String: TRIGGER ■ Receive Data Hexidecimal: 33 37 37 2E 34 37 37 20 31 37 30 2E 33 37 31 …(Omitted) String: “377.477 170.371 …(Omitted)