omron — 7.3.6. Transferring the Project Data

7 . EtherNet/IP Connection Procedure Precautions for Correct Use If you change the connection settings (tag data link table) after performing the synchronization, the changed connection settings (tag data link table) are not transferred even when performing the synchronization again. When you transfer the changed connection to Controller on the Built-in EtherNet/IP Port settings, click Transfer Settings Connection Settings Tab Page. 35 14 Check that the synchronized data is displayed with the color specified by "Synchronized" and that a message is displayed stating "The synchronization process successfully finished". If there is no problem, click Close.

*A message stating "The synchronization process successfully finished" is displayed if the Sysmac Studio project data coincides with the Controller data. *If the synchronization fails, check the wiring and repeat from step 1. 15 Check that ERR/ALM indicator in the Controller Status Pane changes to green color and that PROGRAM mode is displayed.